| Step | Tools | |
|---|---|---|
| 1 | Manage the project
4
Implement project management standards: manage
the plan, issues, risks, status meetings, change control and acceptance
sign-offs using templates provided and adapted from Preparation phase. |
|
| 2 | Secure sign-offs
4
As completed, secure sign-off on key deliverables
using adapted acceptance form from Preparation phase. |
|
| 3 | Drive project to business case
4
Assure project is in sync with business case. |
|
| 4 | Information assurance implementation
4
Support system security engineering, develop and
implement information assurance (IA) policies and procedures and develop
and conduct IA training. |
|
| 5 | Maintain project status
4
Hold regular project status and steering committee
meetings and document status and minutes using adapted templates from
Preparation phase. |
|
| 6 | Create detailed project plan
4
Create detailed project plan for Design and Build
phase of project. |
|
| 7 | Compare interface requirements with existing interfaces
4
Review existing DoD logistics systems information
and interfaces to understand existing system interfaces and update
SV-1, Systems Interface Description, and SV-3 System to System Matrix. |
|
| 8 | Review Existing System Support
4
Review and update systems architecture products
in concert with the BEA-Log systems architecture. |
|
| 9 | Develop System Performance Parameters Matrix (SV-7)
4
Detail the performance characteristics of system
hardware and software elements. |
|
| 10 | Train project team
4
Provide overview training on the software for
the project team. Also train the project team on the implementation
methodology, providing details and specifics for Design and Build
phase. |
|
| 11 | Manage the project teams
4
Assure all team leads and members understand and
are properly completing their assigned tasks for the Blueprint phase
per the project plan. |
|
| 12 | Define end user training requirements
4
Assure end user training requirements are defined. |
|
| 13 | Assess project risks
4
Manage and monitor project risks. |
|
| 14 | Assure Blueprint is complete
4
Validate all tasks for Blueprint phase are complete
and appropriate sign-offs are secured. |