Capture, analyze, and document requirements and processes that address business goals in a manner that is consistent with/and leverages the capability of the packaged solution; refine project plan to capture revised tasks, deliverables, and estimates based on experience; Train project team in capabilities of selected software application's functionality; Document detailed functional and non-functional requirements and scope; Draft high-level design of how the new system will meet the functional requirements; Document high-level required conversions and interfaces; Identify gaps in software solution and draft high-level design of proposed alternatives for addressing gaps (including reports and extensions)

| | Steps
Step Tools
1 Manage the project 4
Implement project management standards: manage the plan, issues, status meetings and change control using templates provided and adapted from planning phase.

Process for gathering and reporting lessons learned

2 Secure signoffs 4
Secure signoff of key deliverables using adapted acceptance form from planning phase.
3 Drive project to business case 4
Assure project is in sync with business case.
4 Information assurance implementation 4
Support system security engineering, develop and implement information assurance (IA) policies and procedures and develop and conduct IA training.

Information Assurance Roadmap

Information Assurance Guide

5 Maintain project status 4
Hold regular project status and steering committee meetings, and document status and minutes using adapted templates from planning and preparation phase
6 Create detailed project plan 4
Create detailed project plan for design phase of project.
7 Compare interface requirements with existing interfaces 4
Review existing DoD logistics systems information and interfaces to understand existing system interfaces and update SV-1, Systems Interface Description, and SV-3 System to System Matrix.

Sample Logistics Systems Database

8 Review Existing System Support 4
Review and update systems architecture products in concert with the BEA-Log systems architecture.

BEA-Log Repository

9 Develop System Performance Parameters Matrix (SV-7) 4
Detail the performance characteristics of system hardware and software elements.
10 Train project team 4
Provide overview training on the software for the project team. Also train the project team on the implementation methodology, providing details and specifics, for design phase.

RICE Process Reference

RICE Development Process & Procedures

RICE Functional Spec Template

RICE Technical Design Spec Template

RICE Object Overview and Approval Template

RICE Project Overview Template

11 Manage the project teams 4
Assure all team leads and members understand what tasks are to be accomplished during the requirements phase.

RICE Repository

RICE Interface Overlap

RICE Conversions Overlap

RICE Extensions Overlap

RICE required due to policy

RICE due to SAP gaps

Business Process Re-engineering Guide

RICE Process Reference

Business Process Master List - BPML Intro and Sample

BPML Management Guide

12 Define end user training requirements 4
Assure end user training requirements are defined.

End User Education and Training — Lessons Learned

Education and Training Concept of Operations (CONOPS)

Sample Education and Training Tools

13 Assess project risks 4
Manage and monitor project risks.

Risk Management Plan Template and Guide

Risk Management Checklist

14 Assure detailed requirements are complete 4
Validate all tasks for requirements phase are complete.

Sign off Checklist for Blueprint Phase